  • This is a great start to the M&E Planning course.

  • the importance of M&E is crucial in project success. it provide room to critically looked into the project to ensure the goals are accomplished which include satisfaction on the side of the sponsor and render service to the beneficiary.

    1. M&E helps to identify the most valuable and efficient use of resources.
      2.It determines when the programme is going to plan and when changes may be needed.
    2. M&E provides data needed for strategic planning, designing and implementation of programmes.
    3. It also helps in checking whether the desired output of a project is achieved or not and the necessary action to be take.
  • M&E is important as long as it allows projects to be successful by establishing an adequate plan starting with the setting of objectives, the establishment of indicators to be monitored regularly before moving on to the evaluation where the level of achievement of the objectives set at the outset is measured.

  • I enjoyed this first module

  • i think it is best way of learning by," implementing the tools which you want to learned.

    D
    1 Reply
  • The M$E is important because it helps;

    1. Clearly state and explain the goal of the project, so that it is known to the team members.
    2. Know the progress of the project especially is there is a defined measure of progress.
    3. Figure out how the project is affecting the beneficiaries.
    4. The team know what the beneficiaries think of the project.
    5. The team members know how the project can be improved
    6. Measure the success of the project
    7. To catch problems that may affect the project and make changes on time.
  • 1.Decision making
    2.Uphold the accountability

    1. Re schedule the project
    2. Measure the progress against expected result
    3. Re-shifting the staffs
    4. Re-budgeting
  • M&E is important to control the project which have to meet with progress regularly and keep on tracking whether the project are on right track or not, and measuring whether project meet according to the objectives or not.
    So M&E take important role to over view the project time to time.

  • Monitoring and Evaluation is very important step and tools to measure the successful of the project. It should be included in master workplan since the project preparing phase and until completion.

  • Learning about the importance of M&E is great. I am seeing how I can integrate this theory into my everyday workplans.

  • obviously MEH project team are unable to measure the intended outputs and outcomes of the project, while GOOD project team is on a track to measure the progress of project activities and the can easily determine on what have already and done and what needed to do the next

  • Well when we see the given two case, first case has described how the M&E has been used to measure the efficiency and effectiveness of the project. On the other hand in the MEH case we can clearly distinguished that the stakeholders are in dilemma to check whether output or outcome of the project.
    So some of the importance we can see from the given case are:

    • M&E allows for understanding efficiency and effectiveness of the project

    *M&E allows to identify the real gap of the project

    • M&E promotes sustainability of the project

    • M&E enables on understanding the ground realities

    • M&E promotes the approach of Specific, Measureable, Attitude, Reliabilities and Time (SMART) ideology.

  • It helps in understanding the step by step processes that a business needs to go through, as well as point out the hiccups that are faced along the way.

  • Monitoring evaluation allows you to measure the progress of a project compared to the initial objectives. It allows, with regard to the objectives, to determine intermediate results, to define indicators for measuring performance and to set up a system of collection, processing and analysis of data to facilitate decision-making.

  • Hello fellow M & E'st. my names are Maurice Luchen from Zambia. I am excited about this platform and looking forward to learn and exchange ideas with everyone. Feel free to engage in discussions with me.

  • M&E is a critical component for any organization in keeping track how our project is doing. Any project reqires an M & E plan to determine if we are meeting set objectives.

  • The importance of M&E can not be ignored because, it is the back bone or foundation to a successful project, if an organization is to achieve accurate precision and an insight to a project, the a plan is very important.
    As we see in the two project example stated above (the Good is more likely to succeed because the have an M&E plan, but the MEH is likely to fail since the have no idea on an insight on how to go about achieving their goal as the the team has no knowledge of an M&E plan.

  • Those are good example that will help me how to create a successful M&E Plan.

  • The topic is really very interesting

    J
    1 Reply
  • That is because it helps one to plan and evaluate the organisation`s activities and adjust where necessary

  • Helps projects to evaluate their performance
    Helps projects monitor their activities.
    Helps projects stick to their goals and objectives
    It is a basis for funding projects

  • IMPORTANCE OF M&E

    1. Greater transparency and accountability
      One of the greatest benefits of M&E is helping organisations to track, analyse and report on relevant information and data throughout the life cycle of a project. This allows the project team to provide robust evidence for all their actions and decisions to stakeholders, donors and community members from day one.
    2. Improved project performance
      A well planned M&E helps the project team to get a better understanding of the target population’s needs. This helps to define the scope of the project and design objectives that are relevant, measurable and achievable. A well-defined M&E plan also clarifies the process and interventions that will lead to the project’s outputs and deliverable. Moreover, M&E helps the team to plan an end-to-end indicator management system, identify effective tools and methodologies
    3. Effective resource allocation
      All project operations are interwoven around project budgets. The amount of available cash dictates the duration and magnitude of interventions, choices of resources, number of employees etc. M&E is an effective tool for enhancing the efficiency and effectiveness of finances in project implementation. M&E facilitates with the estimation of the value, worth and impact of project components
    4. Promotes learning & data-driven decision making
      M&E data provides quantifiable results to help the involved parties to learn from project successes and challenges and be more adaptive. Involved parties are better prepared to respond to the ever-evolving project situations, determine what worked and what did not and why it did not work
    5. Systematic management of organisation
      M&E also functions as a performance management tool as it facilitates organisations to gather, disseminate and utilise information and data to improve their internal operations and add value to their organisation. Organisations can thus focus on their objectives such as enhancing performance,
  • Her team knows precisely what its goals

    10 traineer

  • Monitoring and Evaluation has vital importance, specially in a live of a project it really help us to know how can we conduct our activities based on plan and how we collect data from the field and how we evaluate the progress of the project.
    therefore existing of M&E is very crucial in all entire live of a project.

    D
    1 Reply
  • The use of two examples to give a background about what M&E entails, which contexts it can be used, the timing for making M&E plans and the elements is great. The first case where GOOD has clear goals and objectives to meet give the impression for a starting point; basic information required to establish a M&E plan. However, the second case of MEH also shows that even without a clear objective and time specificies for achieving them to start with, the fact that the project is not yet set in motion gives room for developing a proper M&E framework.

  • it is useful for me

  • The Importance of M&E is to find out how to reach the main goal by put together resources as well as they are given firstly by build a plan of data collection on how to achieve the objective, how this project is benefit for recipients lives, how to make a report, how many time the report will be done in the year, what is the appropiate time to produce it and to who this report is adressed.
    Properly for MEH, the plan have to be built on how many girls are concerned on the one hand, what amount of money is dedicated for what kind of project that will be financed, what is the social impact by financing several procjects, what is the annual target aimed and on the other hand, what is the appropiate time to prepare the report to donor and how many reports are needed.
    The plan must allow MEH to detect problems and find out appropiate solutions, and measures how successful thisr project will be to convince funders and partners

  • You are right. In adtition, the M&E allows us to learn about the impact of the project on the beneficiaries life, and how to improve aspects that are less highlighted, for the similarly future projects.

  • Thanks for this idea. But i would like to know, if it's possible at this stage to know about tools that are willing to be implemented? My point of vew is the following one: The module 1 allows us to define, general context of our project.

  • monitoring and evaluation is actual an important in program and projection management. M&E help investors and donors get the picture of efforts.
    It help project and program manager knows how to predict the future
    Employers and employees becomes motivated by getting a clearer picture of their labor.

    1. M&E help to Planning
    2. Set performance Indicator
    3. Decision making
    4. Re-scheduling the Project
    5. Re-Budgeting
    6. Re- staffs shifting
  • Monitoring and evaluation are ways of systematically measuring and assessing the activities of projects and programme and results. Their purpose is to check on the progress of implementation of the projects and programme systematically. They help to determine when a programme is going to plan and when changes may be needed. Hence, M&E is very important part of the implementation of the projects and programme.

  • to evaluate performance of the project
    to find appropriate plan for the project
    to find the outcome of the project

  • The importance of M & E is to create an M & E plan

    R
    1 Reply
  • It provides the only consolidated source of information showcasing project progress;

    it allows actors to learn from each other’s experiences, building on expertise and knowledge;

    it often generates (written) reports that contribute to transparency and accountability, and allows for lessons to be shared more easily;

    it reveals mistakes and offers paths for learning and improvements;

    1. M and E helps project managers in keeping track the implementation of the projects and its prudence in the utilization of the resources.
    2. It also provides decision makers with a strategy to plan for sustainability of the projects and guidance for future endeavor
    3. It helps the donors to be able to appreciation the impact of their funding. This is done through a comprehensive report after M and E
    4. It helps to track the records of the failing projects, thereby helping the managers to make necessary amendments or improvements
    5. It helps improve success rate of the project
  • THE FIRST GROUP GOOD ALREADY HAVE AN M AND E PLAN ON HOW THEY WILL CARRY OUT THE PROJECT AND THE PROJECT WILL BE MONITORED ON A DAILY,WEEKLY, MONTHLY AND ANNUAL BASIS TO SEE IF THE ACTIVITIES MATCHES THE OBJECTIVES THEY HAVE CREATED .

  • I am really excited and I cannot wait to start creating my own M&E plans for projects.

  • what are strategies of making monitoring planning

    1. Introduction Document
    2. Logical Framework (logframe)
    3. Indicators Document
    4. Data Flow Map
    5. Roles and Responsibilities Chart
    6. Plan for Data Quality Management
    7. Plan for Data Analysis and Use
  • the M&E help to know precisely what to do in a project, how to do,how to measure the progress of the project,what it's necessary for the project, how to reajust the project if they are any problem and how succesful the project will be.

  • M&E is a roadmap with guideline to your project to effectively reach the destination. The effectiveness does not only mean that you strictly follow the manual and reach the goals within the time planned but also mean that you have timely realized that there are unappropriated plan(s), fixed them, and driving the project to the same destination.

  • Importance of M&E is so that as you run your project you are able to know firstly whether your project is having a positive impact on the community. It also helps in coming up with the tools and indicators that you are going to use to measure the success of your project and whether the target community of your project will be able to benefit or not.

  • A GOOD M&E WILL BOTH TO SUCCEED

  • Really getting interested. Can I at this point choose a fictitious project to work with through the entire course?

  • From the little insight so far, Monitoring and Evaluation is critical to a successful project;

    • help project manager keeps track of ongoing project routinely

    • provides avenue to know whether project implementation is in line with project planning.

    • help detect at what point did deviation occurred.

    • help measure the degree of success or otherwise of the project under review.

    • assist manager take informed decision

  • Importance of M&E is so that as you run your project you are able to know firstly whether your project is having a positive impact on the community. It also helps in coming up with the tools and indicators that you are going to use to measure the success of your project and whether the target community of your project will be able to benefit or not.

  • Importance of M&E is so that as you run your project you are able to know firstly whether your project is having a positive impact on the community. It also helps in coming up with the tools and indicators that you are going to use to measure the success of your project and whether the target community of your project will be able to benefit or not.

    Creating data collection tools is very important because with the right tools your M&E can become very effective

  • I think we should specify the microloans was for What ?
    Is it for start new businesses ?
    or is it for help girl to financing their daily needs?

    J
    1 Reply
  • M&E is not only critical for the project success but also important source of information that can guide future projects. Adequately gathered and documented information can be used as critical reference points in identifying risks and assumptions likely to be encountered in future projects. However, M&E is not an end in itself for project success but rather a means to an end. Whenever evaluations reveals that progress does not match up to the project goals, the implementers have a duty to make necessary adjustments. Being that projects operate within time, cost and quality constraints, no project manager wants to realize errors only at the project completion stage. M&E helps to anticipate the project pathway/life cycle, mirror its outplay and provide various mechanisms for navigating through even some of the challenging situations along the way.

  • Yes. This is true. It is not even the inability to monitor progress that makes M&E plans important. The probability of project failure makes it even more essential. Without a M&E plan, the project turns into some wondering fleet not sure whether it is heading to hit an iceberg or not. With well identified and clear indicators, the projects gets to know in advance that it is destined to ruins or success. What a good way to increase project success chances!

  • knowing how to prepare an M&E plan is a welcoming news for me.

  • Monitoring and Evaluation helps one measure the progress of a project. Monitoring and Evaluation helps us to collect information about a project and how the project can be improved upon. It also helps one to track problems and how to make necessary changes.

  • it is useful for me

  • The importance of M&E are as follow;

    To guide in coming up with a project plan which details out the time frame and the activities for that project.

    Identify the project objectives which will be the measure of how successful the project was

    To inform other similar projects to come.

    To device means on how the project objectives can be met.

    M&E communicates to the coordinators when then the project is going wrong and they can find solutions on how to get back on track

  • MEH should developing clear M&E plan to measure all the information related to the project so make sure the project achieving all the putted goals.

    J
    1 Reply
  • M&E helps an organization to define the parameters to measure and how to measure them. The indicators are clearly defined and output for each process are identified. It helps to assess the progress of the project and deviations.
    Secondly, it validates the objectives and goals by the use of data. Therefore, it improves decision making by incorporating the data driven aspect.

  • In both cases, the importance of M&E will be to collect timely information that allows the projects to be made sustainable over time, but that allows establishing timely compliance measurement indicators.

  • M&E is a vital unit in any organization. And I hope to learn how to prepare an M&E plan and how to creat a plan for my own project.

  • I have learned the importance of M&E as it helps to measure the progress of a project, helps to track performance overtime, make informed decisions and efficient use of resources.
    M&E is also important in measuring how well the project activities have achieved the projects objectives and how much changes in outcomes have directly linked to a projects intervention.

  • The importance of M&E is to collect and evaluate the data collected for the intended project in order to give proper understanding of the outputs and outcomes of the project

  • To develop a plan, MEH should consider answering the following questions
    What is the quantitative target of MEH? How many girls do they want to support?
    What areas of investment the loans are targeting? Are the loans being used by the beneficiaries do develop in the target investment areas? How many businesses have been developed by the loans? What is the present value of the business since the loan investment (business growth)?
    What is the Maximum amount of loan that can be given out to one girl?

  • very important in sense that for you to reach your goals you have to monitor the process to ensure that the project goes according to plan and evaluate to ensure that the outcome is reached

    J
    1 Reply
  • these both projects sets a great example

  • ALTERNATIVE TRACK - DO FOR SOMETHING REBRANDING PROVINCE IN INDONESIA

  • The Monitoring generates data that can be used during evaluations and The evaluation seeks, therefore, to determine as systematically and objectively as possible the importance, relevance, efficiency and effect of a project, depending on her goals.

  • monitoring and evaluation must be part and parcel of project design, with an allocation of between 5-10% of the entire project budget

  • enjoyed it too

  • uniformity of how to measure the impacts is also key among the project staff

  • this is very key for sustainability and target realisation

  • would it be sensible to have project staff evaluate their project, if they can guarantee unbiasness

  • microloans are mostly business oriented

  • each and every project needs to have a well functioning m&e plan

  • An M&E plan will help projects know their goals precisely, enable them know indicators of success in achieving their goals, know and see problems immediately they arise and quickly take steps towards solving them. Equally, the plan will help them monitor project progress. It will give a clear view if necessary data needed, how to collect and use such data as well.

  • Monitoring and evaluation is very important as it helps view progress in a project and assess after project is done. It also helps in collecting data that might be useful in next project.

  • Le suivi et évaluation peut servir à démontrer que les activités mises en œuvre dans le programme ont eu un impact mesurable sur les effets escomptés et qu’elles ont été exécutées de manière efficace. Il est essentiel pour aider les responsables, les planificateurs, les réalisateurs, les décisionnaires et les bailleurs de fonds à acquérir les informations dont ils ont besoin pour comprendre le déroulement du programme et pour prendre des décisions informées à ce sujet.

    Le suivi et évaluation aide à déterminer l’emploi le plus efficace et le plus utile que l’on puisse faire des ressources. Il est indispensable pour tirer des conclusions objectives concernant la mesure dans laquelle on peut dire que les programmes ont « réussi ». Le suivi et évaluation fournit les données nécessaires pour guider la planification stratégique, pour concevoir et exécuter les programmes et les projets, et pour mieux allouer et réallouer les ressources.

  • This is a good explanation examples. M&E is very important for all project to touch effective and efficient achievements.

  • it enables the M & E team to stick on organizational goals.
    it enables the organization to create M & E plan for the organization
    its always good during resource allocation to the organization
    improves project performance.
    promotes data-driven decision making

  • Monitoring and evaluation help to measure the success of the project and in case any problem comes up it is easy to identify the problem right away and make any necessary changes.

  • I came to know through this module that developing a M&E plan is essential before the implementation of the project on ground

  • The importance of monitoring & evaluation cannot be over emphasize in a world driven by data. Monitoring & Evaluation help to measure progress of our projects, keep tracks of performance, make informed decisions, and determine if project objectives are being achieved.

  • M& E helps in tracking performance over time to make informed decisions about the effectiveness of projects and the efficient use of resources.

  • This course is very interesting I can't wait to vge through it. Thanks to Philanthropy University.

  • As showed there are two projects the first project had a clear M&E plan, but the second project will require some clear ideas and thought to get in the right way and a good M&E plan. I hope to succeed in developing a good M&E plan for the MEH project.

    E
    1 Reply
  • The importance of the M&E plan are:

    • Measure the progress of the ongoing activities of the project and the outcomes
    • lesson learned for future
    • know how the project use their recourses properly and efficiently
  • In my opinion , the main importance of M&E is acting like GPS that show us we are in the right track in in our project route or implementation.

  • Excellent. That is what I expected.

  • I think an M&E Plan is the backbone of a project. Without a proper M&E you cannot build on the lessons learned or you cannot provide basis for upcoming events.

  • An M&E plan is important because you are able to make informed decisions based on data and quickly identify problems with the project.

  • Great module. It helps a lot, especially the M&E Plan Template ! what a nice surprise at end of the module.

  • Monitoring and evaluation is like a tool applied to guide the operation of a given project on the right track, throughout the life of the project. Therefore, it is an important tool applied to make the project successful.

  • Hi everyone!
    I'm glad to join you on this interesting course.
    Has anyone designed an M&E plan before? Please share your experience with us.

  • Monitoring is important to check that you are always on your way to get the goal, to see the problems very fast in order to resolve them immediately. Monitoring is helpful to anticipate problems too, so it might helps to avoid big failures. Monitoring is important for members of the team, because each teammate can see where the plan is, what is done ou what left to be done. Thanks to monitoring, each member of the project can react by giving solutions about issues, or by warning about problems. Monitoring guides the decisions to take. Choices and decisions are justified by datas collected in monitoring. That's why monitoring gives interesting datas to analyse in order to use efficiently ressources and money in the project.
    Evaluation is important to know if you succeeded, if you reach the goal, if the job is done well or not. It is important to know the quality of outcomes. Thanks to evaluation, you can identify right actions to duplicate in other plans and wrong actions to avoid in other plans.
    Thanks to m&e, the team of the project will work better together because each member of the team knows his own task in s&e, understands the meaning of these tasks and how s&e is useful for the project, how s&e will improve quality of the project. m&e you define what datas to collect, how to collect and what to do with these datas in your project to be successful.

  • The importance of M&E is two fold as stated by the name i.e. monitoring and evaluation. Monitoring is mainly concerned with the collection of data/information pertaining to the project in order to be able to measure the progress of the project or activity. The data/information collected assists in tracking the performance of the project and make informed decisions on the effectiveness of the project.
    On the other hand, evaluation is used to measure the progress of various project tasks in relation to the set project activity outcomes.

  • It is interesting to learn the whole process to accompany and help different organizations, and especially vulnerable populations, I am excited to learn about monitoring and evaluation to effectively guarantee the help to people, and that their projects are sustainable in the long term to live of its ecological resources.

  • The monitoring and evaluation approach proposed makes it possible to support the various stages of a project, from the choice of options to its final evaluation, including its planning and implementation.

  • I have learned a lot so far.

  • The example of GOOD and MEH has already set my mind on what to expect, how nice!!!!

  • Hi, am Wambia from Kenya. I find this course so productive and interesting. I realize that when coming up with a project and it's M&E plan, following the procedure given by this course in module 1 makes it precise and easy to follow up.

  • M&E also helps to under project goals better, decide relevant indicators, develop tools and measurement methods and find out effectiveness of the project