  • It is important to understand the risks and assumptions during project design, as this will enable project implementers assess whether a n identified risk poses a major threat to the effective implementation of the project and if so, interventions measures are proposed. on the other hand, if the identified risk or assumptions are not posing a major threat they can be tolerated.
    Another factor supporting why risks are to be understood, its because it helps us appreciate events and conditions which are foreseable that might affect implementation and thereby, giving enough time for interventions to be proposed and decisions made timely.
    It further, brings the implementers and beneficiaries together in the identification of the risks and assumptions, thereby, earning the support of the beneficiaries as they feel the sense of ownership of the project.
    It is also important to identify the project risks and assumptions as it will bring out evidence based interventions thereby, removing the biases of the project implementers.
    It is further, understood that the logframes are living documents and should be tested and reviewed as and when the conditions in the project change and adjustments can be made for effective implementation of the project.

  • I think Risk and assumption is a important part in a logical frame work. If we identify the possible risk and assumption In a designing period of log frame, it will help us to implement our activities smoothly and achieved the result as per our desired goals.

  • Identifying risks and assumptions serves to assess whether the Goals and Activities proposed are realistic and achievable in the given time frame and within the given available human and financial resources.
    In this context, a risk is defined as an uncertain threat that, in case of occurring, could have a negative impact in the completion of the Goal or Activity. An assumption, on the other side, is the necessary condition that will enable the successful completion of the Goal or Activity.
    In order to avoid repetition and redundancy, risks and assumptions should be defined at two levels: general and specific level.

    General risks and assumptions can be either related to the overall implementation of the Roadmap or common to all Goals included in the Roadmap. Specific risks and assumptions will be related to a concrete Activity, i.e. a particular risk that could hinder the successful implementation of a concrete Activity or an assumption that is key to the implementation of a specific Activity. For instance, a specific assumption for the Activity "establishing an Authorised Economic Operators Scheme" is that incentives granted to AEOs are enough to motivate private traders to invest in the time and resources to get the certification.

    If described negatively, an assumption can become a risk. On the contrary, if defined in positive terms, a risk can be transformed into an assumption. Thus, it is very important to pay attention to redundancy.
    Assumptions that were considered in the form of risks do not need to be noted again and vice-versa. Similarly, risks and assumptions that were defined at general level, do not need to be mentioned again at specific level. If resistance to change is a major risk for the overall completion of the Roadmap's Goals, it would be also risk for the different Activities considered.

  • Risk and assumptions are only possibilities that may occur during the project which can hurt project impact.

    C
    1 Reply
  • Risk & Assumptions are the possibilities of having something negative which can hurt the project impact. Risk and assumptions are uncertain.A risk refers to a potential event or situation that could have a negative impact on the successful achievement of a project's objectives and outcomes. Risks are uncertainties that may or may not occur but could affect the project's progress and results. It's important to identify and analyze risks during project planning to develop strategies for mitigating or managing them if they do materialize. Risks can range from external factors such as economic changes , disaster or political instability to internal factors like resource shortages or technical challenges. An assumption in a LogFrame refers to a condition or factor that is believed to be true or will exist, and upon which the success of the project depends. Assumptions are essential elements that underpin the logical connection between a project's activities, outputs, outcomes, and impacts. These assumptions are critical because if they turn out to be incorrect or fail to materialize, they can jeopardize the entire project's success. Assumptions are essentially the conditions that need to be met in order for the project to achieve its intended outcomes.
    Both risks and assumptions play a significant role in project planning, implementation, and monitoring. They help project managers and stakeholders anticipate potential challenges and prepare for them. It's important to regularly review and update the identification, analysis, and management strategies related to risks and assumptions throughout the project lifecycle. This proactive approach enhances the project's chances of success and allows for timely adjustments when unforeseen issues arise.

  • Risk & Assumptions are the possibilities of having something negative which can hurt the project impact. Risk and assumptions are uncertain.A risk refers to a potential event or situation that could have a negative impact on the successful achievement of a project's objectives and outcomes. Risks are uncertainties that may or may not occur but could affect the project's progress and results. It's important to identify and analyze risks during project planning to develop strategies for mitigating or managing them if they do materialize. Risks can range from external factors such as economic changes , disaster or political instability to internal factors like resource shortages or technical challenges. An assumption in a LogFrame refers to a condition or factor that is believed to be true or will exist, and upon which the success of the project depends. Assumptions are essential elements that underpin the logical connection between a project's activities, outputs, outcomes, and impacts. These assumptions are critical because if they turn out to be incorrect or fail to materialize, they can jeopardize the entire project's success. Assumptions are essentially the conditions that need to be met in order for the project to achieve its intended outcomes.
    Both risks and assumptions play a significant role in project planning, implementation, and monitoring. They help project managers and stakeholders anticipate potential challenges and prepare for them. It's important to regularly review and update the identification, analysis, and management strategies related to risks and assumptions throughout the project lifecycle. This proactive approach enhances the project's chances of success and allows for timely adjustments when unforeseen issues arise.

  • Hi, How to identify main risks to the project and how to assess that?

    R
    1 Reply
  • Risk and Assumption are very important when developing new ideas and projects

  • Imagine factors that will affect the Outputs and Outcomes of your project. That's where to start from.
    Thanks

  • Assumptions are the conditions or factors that you expect to be true or present for your project to achieve its objectives. Risks are the events or situations that may prevent or hinder your project from reaching its goals.
    Assumptions and risks are important in M&E because they can affect the validity, reliability, and usefulness of your findings and recommendations. If you do not consider the assumptions and risks that underlie your project's design and implementation, you may end up with inaccurate or misleading results, or miss out on valuable learning opportunities. For example, if you assume that your target beneficiaries will participate in your project activities, but they face barriers or disincentives to do so, you may overestimate your project's reach and effectiveness. Similarly, if you do not anticipate or plan for potential risks, such as security threats, data loss, or ethical issues, you may jeopardize your project's quality and credibility.

  • PROJECT SUMMARY
    Impact.
    Reduce the proportion of malaria cases in the health facilities in Kween district.

    Reduce the number of deaths from malaria infections especially among the infants.

    Outcome:
    People sleep under treated mosquito nets.

    Output:
    People receive treated mosquito nets.

    Input:
    Treated mosquito nets

    RISKS AND ASSUMPTIONS;
    Impact;
    The proportion of malaria cases in the health facilities might not reduce.

    The number of deaths from malaria infections might not reduce.

    Outcome;
    People might use mosquito nets for other purposes.

    Output:
    People might not be interested in receiving mosquito nets

    Input:
    The funds might not be sufficient enough to buy treated mosquito nets.

  • Risks and assumptions are two key factors of any project planning. They help you identify the factors that may affect the success or failures of your project, and how to address them in your M& E planning and data collection strategies.

  • PROJECT SUMMARY
    Impact.
    Reduce the proportion of malaria cases in the health facilities in the Sub county.

    Reduce the number of deaths from malaria infections especially among the infants.

    Outcome:
    People sleep under treated mosquito nets.

    Output:
    People receive treated mosquito nets.

    Input:
    Treated mosquito nets

    RISKS AND ASSUMPTIONS;
    Impact;
    The proportion of malaria cases in the health facilities might not reduce.

    The number of deaths from malaria infections might not reduce.

    Outcome;
    People might use mosquito nets for other purposes.

    Output:
    People might not be interested in receiving mosquito nets

    Input:
    The funds might not be sufficient to buy enough treated mosquito nets.

  • If you are an M&E expert, you need to identify risks and assumptions. risks and assumptions will help you to avoid any problem that may lead to hurt the project. It will help you to expect any problem that may occur in the project. Risks and assumptions also help you to create another creative ways to achieve your project.

  • To my very own understanding, risks have to do with anything that has the ability to affect your project positively or negatively and is beyond your control. Assumptions, on the other hand, refer to our "selfish interests" with no evidence to back them up. Therefore, I strongly believe that, when risks and assumptions are excluded from the project design process, there is a high chance of the project failing miserably. This is because, knowing some of these risks and assumptions puts you in a better position to develop measures to mitigate them or adapt along the way.

  • Risks are potential factors that can harm the success of the project e.g people's resistance to new technology.
    Assumptions are based on your beliefs but not supported by evidence.

  • How can fear fear of been unsuccesfull lead to failure dueing in the project life cycle

  • Risks and Assumptions are so important because they can allow you to overcome the last weak points of your project if you had a similar project, and so on. They allow you to control the weak points of your project.

  • To avoid/mitigate risks and stop the our own judgements/biases standing in the way of successfully designing and implementing our projects, it is imperative to identify all the potential risks and assumptions and list them in the logical framework

  • Risque mineur

  • risks and Assumptions in Project Management:

    Risk Assessment: Identifying potential risks is a critical aspect of project planning. Risks are events or conditions that, if they occur, can have a negative impact on the project's success. By identifying risks early, project managers can develop strategies to mitigate or manage them. For example, financial risks, technical risks, and external risks (such as changes in regulations) should be considered.

    Assumptions: Assumptions are factors that are taken for granted or believed to be true but have not been proven or validated. They play a crucial role in project planning because many project elements depend on assumptions. These could include assumptions about stakeholder behavior, market conditions, resource availability, and more. It's essential to make these assumptions explicit so that if they turn out to be incorrect, the project team can adjust its plans accordingly.

    Why Risks and Assumptions Matter:

    Risk Mitigation: By identifying risks, project managers can develop risk mitigation strategies. These strategies can involve contingency plans, risk budgets, and risk response plans. This proactive approach can prevent costly surprises during project execution.

    Resource Allocation: Understanding assumptions about resource availability, such as skilled labor or equipment, helps in proper resource allocation. If a critical resource assumption is incorrect, it can lead to delays and cost overruns.

    Realistic Planning: Risks and assumptions help in creating a more realistic project plan. Unrealistic assumptions or failure to consider risks can lead to overly optimistic schedules or budgets, which are difficult to achieve.

    Stakeholder Communication: Clearly communicating risks and assumptions to stakeholders fosters transparency and manages expectations. Stakeholders should be aware of the uncertainties and potential challenges the project may face.

    Contingency Planning: Contingency plans are developed based on identified risks. These plans outline actions to take if specific risks materialize. Having these plans in place can minimize the impact of adverse events on the project.

    Challenges with Risks and Assumptions:

    Incomplete Information: It can be challenging to identify all potential risks, and some may be overlooked. Assumptions can also be based on incomplete or outdated information.

    Changing Environment: External factors can change, making assumptions invalid. For example, economic conditions or regulations may change during a project's timeline.

    Overemphasis: Excessive focus on risks and assumptions can lead to analysis paralysis, where the project team becomes overly cautious and loses sight of the project's goals.

    In summary, considering risks and assumptions is a crucial aspect of effective project management. It allows for proactive planning, risk mitigation, and realistic project expectations. However, it's essential to strike a balance between thorough analysis and the need to move the project forward. Regularly revisiting and updating risks and assumptions throughout the project's lifecycle is also essential to adapt to changing circumstances.

  • Risks are things outside your control that might disrupt your plan while assumptions are biases, things that you believe without much evidence

  • After completing this section, i feel im in position to come up with a good project log frame showing all activities, outcomes, impacts, risks and assumptions . it has been so interesting to learn about this module.

  • most assumptions have a negative impact on M&E
    risks should be considered in planning so as to minimize om loses
    compromise planning and stratergies

  • It is important to link the Monitoring and evaluation to the project design since it will help during creation of the M&E logframe

    Identifying the risk and assumption on your M&E logframe is cruasal part on planning for monitoring and evaluation because form there it will help you to identify which measures you might take to overcome/minimize the risk as well to avoid bias which might arise during project implentation

  • In the context of monitoring and evaluation (M&E) processes, there are various risks and assumptions that organizations should consider to ensure the effectiveness and accuracy of their M&E efforts. Here are some common risks and assumptions:

    Risks:

    Data Quality Risk: The accuracy and reliability of data collected during monitoring and evaluation can be compromised due to errors in data collection, data entry, or data management processes. This can lead to incorrect assessments and decisions.

    Sampling Bias: If the sampling methods used in data collection are not representative of the entire population or target group, the results may not accurately reflect the reality, leading to biased conclusions.

    Measurement Bias: The instruments and tools used for data collection may be biased or not properly calibrated, leading to inaccurate measurements.

    Resource Constraints: Limited resources, including time, budget, and personnel, can hinder the thoroughness and completeness of the monitoring and evaluation process.

  • Data Quality and Availability: One of the significant risks in M&E is the assumption that accurate and reliable data will be available throughout the project's life. Data collection can be challenging, and errors or biases in data can lead to incorrect conclusions.

    Assumption of Causality: Logframes often assume that the project's activities directly lead to outcomes and impact. However, external factors and other variables can influence results, making it challenging to attribute changes solely to the project.

    Assumption of Linear Progress: Logframes typically present a linear progression from inputs to outputs, outcomes, and impact. In reality, development processes can be nonlinear and unpredictable, which may not be adequately captured in the logframe.

    Assumption of Stakeholder Behavior: Logframes assume that stakeholders will behave as expected, but their attitudes, actions, and responses can change, impacting the project's success.

    Timeframe Assumptions: Logframes often specify fixed timeframes for achieving outputs and outcomes. If these timeframes are unrealistic, it can lead to frustration and disappointment if goals are not met.

    Budget and Resource Risks: Logframes assume that the project will receive the necessary funding and resources. Funding cuts or resource constraints can disrupt the planned activities.

    Assumption of a Homogeneous Target Population: Logframes may assume a uniform beneficiary group, but in reality, the target population can be diverse, requiring tailored approaches and adaptations.

    Assumptions:

    Theory of Change: Logframes are based on a theory of change that outlines how inputs lead to desired outcomes. This theory is an assumption itself, and if it's flawed or incomplete, the entire logframe may be inaccurate.

    Stakeholder Engagement: Successful M&E depends on the assumption that stakeholders will actively engage in the process, provide feedback, and act on the findings.

    External Environment Stability: Logframes often assume a relatively stable external environment, but factors like political instability, economic crises, or natural disasters can disrupt project activities.

    Alignment with Beneficiary Needs: The logframe assumes that the project's activities and outcomes align with the actual needs and priorities of the beneficiaries. If this assumption is incorrect, the project may not have the desired impact.

    Assumption of Capacity: Logframes assume that project implementers have the necessary capacity and skills to execute the planned activities effectively. Insufficient capacity can hinder progress.

    Assumption of Willingness to Adapt: Projects often need to adapt to changing circumstances, and logframes assume that organizations and donors are willing to make necessary adjustments.

  • User
    Risks and Assumptions in M&E

    ChatGPT
    In Monitoring and Evaluation (M&E) processes, there are various risks and assumptions that organizations should be aware of to ensure the effectiveness and accuracy of their M&E efforts. Here are some common risks and assumptions:

    Risks:

    Data Quality Risk: The accuracy and reliability of data collected during monitoring and evaluation can be compromised due to errors in data collection, data entry, or data management processes. This can lead to incorrect assessments and decisions.

    Sampling Bias: If the sampling methods used in data collection are not representative of the entire population or target group, the results may not accurately reflect the reality, leading to biased conclusions.

    Measurement Bias: The instruments and tools used for data collection may be biased or not properly calibrated, leading to inaccurate measurements.

    Resource Constraints: Limited resources, including time, budget, and personnel, can hinder the thoroughness and completeness of the monitoring and evaluation process.

    Resistance to Change: Stakeholders or employees may resist the changes or recommendations proposed as a result of the evaluation, making it difficult to implement improvements.

    External Factors: External factors such as economic, political, or environmental changes can impact the effectiveness of programs or projects being evaluated.

    Incomplete Data: Incomplete or missing data can result from various reasons, including non-compliance of participants or data loss during collection or storage, making it difficult to draw accurate conclusions.

    Assumptions:

    Assumption of Causality: M&E often assumes a cause-and-effect relationship between interventions and outcomes. However, this assumption may not always hold, especially in complex and dynamic environments.

    Stakeholder Alignment: M&E assumes that stakeholders have a shared understanding of goals and objectives. Misalignment or differing interpretations of goals can affect the evaluation process.

    Data Availability: M&E assumes that the necessary data will be available for analysis. If key data is missing or inaccessible, it can hinder the evaluation process.

  • In project planning and management, identifying and managing risks and assumptions is a crucial aspect of ensuring the project's success. Let's delve into a discussion of risks and assumptions in this context:

    1. Risks:

    Risks are potential events or circumstances that could negatively impact the project's objectives, timelines, or outcomes. Identifying and mitigating risks is essential to minimize disruptions and increase the likelihood of achieving project goals. Some key points about risks include:

    Types of Risks: Risks can be categorized into various types, including external risks (such as market changes or regulatory changes), internal risks (like resource constraints or technical challenges), and project-specific risks (such as scope changes or budget overruns).

    Risk Assessment: Project managers should conduct a comprehensive risk assessment early in the project's lifecycle. This involves identifying potential risks, assessing their likelihood and impact, and prioritizing them based on their significance.

    Risk Mitigation: Once identified, risks need to be addressed through risk mitigation strategies. These strategies can include risk avoidance (eliminating the risk altogether), risk transfer (shifting the risk to another party, like through insurance), risk reduction (taking steps to lower the likelihood or impact of the risk), and risk acceptance (acknowledging and preparing for the risk).

    Continuous Monitoring: Risks should be continuously monitored throughout the project. New risks may emerge, and the significance of existing risks may change as the project progresses. Regular risk assessment and adjustment of mitigation strategies are critical.

    1. Assumptions:

    Assumptions are the conditions or factors that are taken for granted as true or certain when planning a project. They form the basis for project planning but may not always hold true. Here are some important aspects of assumptions:

    Identifying Assumptions: Project teams should explicitly identify and document assumptions at the outset of the project. Assumptions can relate to various aspects, such as stakeholder behavior, resource availability, technology readiness, or market conditions.

    Assumption Validation: It's essential to periodically validate assumptions throughout the project's lifecycle. Assumptions that prove false can significantly impact the project's success. Teams should actively seek information or data to confirm or adjust assumptions.

    Assumption Contingencies: Project managers should develop contingency plans for critical assumptions. If a key assumption does not hold, the project may need to adjust its approach, scope, or timeline. Contingency planning allows for a smoother response to changing conditions.

    1. Interplay Between Risks and Assumptions:

    Risks and assumptions are interconnected. Assumptions can sometimes become risks if they are not validated or if conditions change. For example, assuming that a specific technology will be available for a project might become a risk if the technology encounters unexpected delays or issues.

    1. Importance of Communication:

    Effective communication within the project team and with stakeholders is essential for addressing both risks and assumptions. Regular updates on the status of assumptions and risks, as well as any changes, help ensure that everyone involved is informed and can respond appropriately.

    In conclusion, a thorough understanding and management of risks and assumptions are critical for successful project planning and execution. Projects that are proactive in identifying, assessing, and responding to risks and assumptions are better positioned to achieve their objectives and deliver value to stakeholders.

  • I found this module extremely interesting and thought-provoking! Did anyone else find it challenging identifying whether something was an output or outcome?

  • Bais that you for see

  • Risk and Assumptions are intrinsic parts of M&E Logframe that help practitioners in proactively managing uncertainties and making continuous improvements to increase the chances of program or project success.

  • I found the second Module very interesting and informative. Looking forward to work on the assignment.

  • Risks are activities that are beyong your control but can can affect the outcome of your plans while assumptions are what you believe but with little or no evidence

  • Some people may not know the importance of thinking about Risks and Assumptions but they are still things to set before starting any project, they are necessary to be put in a M&E plan. They will give you a degree to which a project can succeed. If the Risks and Assumptions are well-thought you will have an idea about the feasibility of a project.

    S
    1 Reply
  • I have enjoyed module two .it is very nice and clear

  • Risk --- the attributes of risk are the probability of it happening and the impact ( negative or positive) that it might have on a project.
    Assumption are factors that for planning purposes are considered to be true, real or certain without proof

  • I have understood that conducting Risks and Assumptions assessment at all steps enables us to prepare for the worst, for example from the inputs step if the donor stops funding the project when the project is already ongoing, is there an alternative source of income to keep the project going? or the project project will cease operating because of lack of facilitation.

    Another important aspect I have taken home from this module is to look out for any unexpected risks and assumptions that may come in at the end of the project. This helps the M&E improve on the way it plans, monitors or consider that risk and prepare for it in the future related projects.

  • This module has been a lot of fun for me and it has enabled me think critically

  • Planning for risks and assumptions ahead of time is essential as it enables proactive risk management and informed decision-making in project implementation. It helps in understanding unforeseeable events and conditions that might impact the project, giving room for timely and well-informed decisions.
    Testing assumptions against real-world conditions and engaging stakeholders for their insights ensures alignment with ground realities. Additionally, it allows for adjustments and adaptations when unexpected events occur, ensuring project flexibility and success, particularly in complex and dynamic environments.

  • Risk and assumptions play a crucial role in the planning for monitoring and evaluation process. Identifying and addressing these factors upfront helps ensure the accuracy and effectiveness of our monitoring and evaluation efforts.

    When it comes to risk, it's important to anticipate potential obstacles that may hinder the successful implementation of our monitoring and evaluation plans. By proactively identifying risks, we can develop contingency measures to mitigate their impact and maintain the integrity of our data collection and analysis.

    Assumptions, on the other hand, are the underlying beliefs or conditions upon which our monitoring and evaluation plans are based. It's essential to critically examine these assumptions and validate them with evidence. By doing so, we can ensure that our monitoring and evaluation efforts are built on a solid foundation and produce reliable and actionable insights.

    Engaging in discussions around risk and assumptions within the planning for monitoring and evaluation course allows us to tap into the collective expertise and experiences of our peers. By sharing insights and perspectives, we can gain a broader understanding of potential risks and assumptions that may have been overlooked individually. This collaborative approach strengthens our planning process and enhances the accuracy and effectiveness of our monitoring and evaluation efforts.

    Let's continue exploring and discussing risk and assumptions to foster a comprehensive and robust approach to monitoring and evaluation planning. Together, we can navigate uncertainties and maximize the impact of our evaluation initiatives.

  • By acknowledging and addressing risks and assumptions for any project upfront, we can better prepare ourselves to navigate challenges and make informed choices

  • Through this module, I have learnt that it is very important to draw all the risks and assumptions. They help to plan well as other solutions can be brainstormed before the actual challenge is faced.

  • I don't see the work of my peers that I have to review

  • this is very important in consideration that we are to have an advace guess and watch for unexpected but to always understand and look around when working with projects.

  • It was a great session. I have learnt a lot.

  • Jai beaucoup aime le cours et je vais m'applique davantage

  • Identifying Risks and making Assumptions when developing logframe and designing program are critical in strategizing on how to combat foreseen challenges that make arise during the project implementation.

  • Identifying risks and assumptions in project planning is a fundamental process that helps organizations anticipate potential challenges and uncertainties that may impact the project's success. These elements play a crucial role in ensuring that the project's objectives are met and that resources are utilized effectively. Risks are events or circumstances that have the potential to disrupt the project or prevent it from achieving its intended outcomes. They are typically events that may or may not occur but could have significant consequences if they do. Recognizing these risks early allows project managers to develop mitigation strategies and contingency plans to address them if they arise. Assumptions, on the other hand, are the beliefs or conditions that are considered to be true or in place for the project to be successful. Assumptions often underpin the project's logic and the cause-and-effect relationships between inputs, outputs, outcomes, and impact. It's important to identify and document assumptions because if they prove to be incorrect, it can undermine the entire project's foundation.

    In the case of MEH's project to increase the financial prosperity of girls in their province, the assumption that "IF girls receive microloans, THEN girls will start new businesses or upgrade equipment in their existing businesses" is critical. This assumption implies that providing microloans is a sufficient condition for entrepreneurship to flourish among girls. However, it's essential to recognize that this assumption might not hold true in all cases. The level of interest, cultural barriers, or lack of business skills can challenge the assumption's validity. To manage risks and assumptions effectively, project managers need to continually assess them throughout the project's lifecycle. This involves monitoring key indicators, collecting data, and being prepared to adapt the project's strategies if any risks materialize or if assumptions are proven invalid. This iterative approach ensures that the project remains responsive to changing circumstances and increases its chances of achieving the desired impact. In summary, recognizing and addressing risks and assumptions is a dynamic and ongoing process in project planning and management. It helps project teams stay proactive, adaptive, and better positioned to achieve their goals while minimizing potential setbacks

    M
    1 Reply
  • Therefore, it is important that they are identified, and their mitigations measures put in place to ensure that the project is successful.

  • Risks are factors that you cannot control that can make your program go poorly. Assumptions are beliefs that are not supported by evidence.
    Risks and assumptions should be identified when designing your project.
    You should always identify -what are your goals? What are the activities you will apply to reach your goals? and what problems should you avoid.

  • risk and assumption may sometimes be true , there we should always take note of it

  • Risks and assumptions are two fundamental concepts in project management and planning. They are integral to understanding the uncertainties and challenges associated with any project or initiative.

    Risks refer to the potential events or circumstances that could have a negative impact on a project's objectives, activities, or outcomes. These risks can vary widely in nature and severity, and they can come from various sources. It's essential to identify, assess, and manage risks to minimize their impact on a project's success.

    Assumptions, on the other hand, are conditions or factors that are accepted as true, without concrete evidence, to facilitate project planning and decision-making. They are based on expectations, beliefs, or predictions about various aspects of the project. Assumptions can serve as the foundation for project plans but should be regularly reviewed and validated to ensure they remain accurate.

  • Processes for monitoring and evaluating (M&E) are crucial for determining the success and impact of initiatives, projects, programs, and policies. M&E does, however, come with some assumptions and dangers, just like any complicated project. For constructing reliable M&E systems and properly understanding their findings, it is essential to understand these risks and assumptions. We'll go over some typical risks and presumptions in M&E here:

    Risks:

    Data Quality Risk: Errors, biases, and inconsistencies may cause the quality of the data to be compromised. This risk may arise during different phases, such as data collection, entry, and analysis.

    Selection bias: When collecting data for M&E, there is a chance that some groups or regions will be over- or underrepresented, which could skew the results.

    Risk of Sample Size: If the sample size is too small, M&E results might not be statistically significant, making it difficult to draw inferences or extrapolate results.

    Data accessibility: Legal, moral, or practical restrictions may make it difficult to access data. The completeness of the data utilized for M&E may be hampered by this risk.

    Failure of an Assumption: M&E frequently makes claims about the causal connections between inputs, outputs, and results. Inaccurate assumptions could lead to deceptive M&E findings.

    Timing and Lag Risk: Particularly for time-sensitive programs, delays in data collection and reporting can have an impact on the accuracy and applicability of M&E findings.

    Assumptions:

    Relationships between Inputs and Outcomes: M&E makes the assumption that changes in outcomes can be linked to certain Inputs, Activities, or Interventions. In systems with numerous influencing components that are complex, this presumption could not be accurate.

    Data Reliability: M&E makes the assumption that the data it collects is correct, impartial, and indicative of the context or target demographic.

    Comparable Baselines: M&E frequently makes comparisons using baseline data. The underlying presumption is that baseline data consistently reflects initial conditions and reliably reflects them across time.

    Implementation across Locations or Groups: M&E presupposes that interventions or programs are applied uniformly. Results may differ depending on how things are done.

    A linear progression from inputs to outputs to outcomes is sometimes assumed by M&E. In fact, progress could not be linear, and feedback loops might make things more complicated.

    Sustainability: A lot of M&E systems make the assumption that an intervention's beneficial benefits will last long after the program has ended. However, this might not always be the case, and more assessments might be required.

    It's crucial to do thorough planning, confirm assumptions through stakeholder involvement and data verification, and routinely evaluate and update M&E systems to adapt to changing circumstances in order to reduce risks and account for assumptions in M&E. For assuring the validity and use of M&E results, transparent communication of M&E methodologies and limits is also crucial

  • Identifying risks and assumptions is a linear process. It overlaps with the results chain of a program; an event; a project etc. However, this process is theoretical. Accordingly, It should be based on theoretical knowledge of a specific subject or area of the selected event program, or project. Getting knowledge on the specific area or getting help from an expert who is knowledgeable in the specific area is highly recommended for identifying risks and assumptions.

  • Assessing risks and assumptions during project planning and continuously managing them is crucial. It helps proactively address challenges, ensuring project success.

  • Risks and assumptions are very important for a project as they let us counteract our natural biases. Just because we believe a certain project will have an impact on the problem we want to solve doesn't mean it will. It is especially important to consult those who are experiencing the problem on what risks and assumptions they see in the logframe as they have expert knowledge in this problem.

  • Risks and assumptions have a large impact on projects, but early identification during design and preparation with a solution will lead to the achievement of the goal we set for ourselves.

  • Risks and assumptions are vital in any given M & E planning. Without risks and assumptions, no project is fully guaranteed a success. In every projects, risks should be identified beforehand and included in the plan as they are unexpected and could disrupt your plan as well as assumptions are your biases that could affect your plan without substantiating evidences.
    Identifying risks and assumptions early could project your plan beforehand.

  • Risks are the things outside of your control that disrupt your plan. Suppose, a project related to policy approval, activation and implementation where governmental officials support would be the main risk. Perhaps, We think that they could support us which will an assumption.

  • To my very own understanding, risks have to do with anything that has the ability to affect your project positively or negatively and is beyond your control. Assumptions, on the other hand, refer to our "selfish interests" with no evidence to back them up. Therefore, I strongly believe that, when risks and assumptions are excluded from the project design process, there is a high chance of the project failing miserably. This is because, knowing some of these risks and assumptions puts you in a better position to develop measures to mitigate them or adapt along the way.

  • Data collection is as important as any other segment of the M&E process. Wrong data can lead to bad choices, misinformation, project failure, et cetera. This will lead to a waste of time and resources. Therefore, it is important to design a data collection tool that measures the indicators of project success.

  • I think that Formative research is an invaluable step in the process of designing effective M&E systems. It helps us gain a deep understanding of the context, stakeholders, and potential challenges that may arise during project implementation. Given its significance, I'd like to propose that philanthropy staff consider kindly organizing an online training session in the near future to delve deeper into this topic. Such a training could provide us with the tools and knowledge needed for a comprehensive understanding of the M&E field, particularly with a focus on formative research. It could be an excellent opportunity for us to enhance our skills and ensure that our M&E efforts are well-informed and yield meaningful results. I'm excited about the potential for learning and growth in this area. What are your thoughts, and would you be interested in participating in such a training session?

  • let assume that my project has the impact "improving the quality of life of old people"
    Outcome:Independence in every day life with minimal assistance
    output:Cognitive stimulations and medication compliance
    Input:Trained nurse and Occupational therapist
    Risks and assumptions:Old people mighty not participate in cogntive stimulation actiivities, Cogntive stimulation mighty not work to some old people, medication compliance mighty not work to improve activity participation, some old people mighty not accept to follow the medication as prescribed.
    Unrealistic targets
    Imagine ,i don't have enough occupational Therapist and nurses , the target will be differe from my expectations because the inputs are not enough ,as welll there is no incetives

  • Risks and Assumptions are very essential elements of the logframe.

  • Risks are factors that you have no control over that could make your projects not work out the way you planned it.
    Assumptions on the other hand are thought bias .

  • Risks and assumptions exists so you could work against factors that are outside your control and within your control that could work against your project. By taken the necessary measures to counter them.

  • It's important to note that risks and assumptions are not static. They should be regularly reviewed and updated as the project progresses and new information becomes available. Mitigation plans should also be in place for identified risks to minimize their impact. Regular risk assessment and adaptive management are essential to ensure a project's success in the face of changing circumstances.

  • Risks:

    1. Funding Uncertainty: Relying on external funding sources, such as grants and donations, can be risky. There may be delays in funding disbursement, changes in donor priorities, or unforeseen economic downturns that affect funding availability.

    2. Community Resistance: Resistance or skepticism from community members or local leaders can impede project implementation. It's important to build trust and gain community buy-in to avoid such challenges.

    1. Political and Regulatory Challenges: Changes in government policies, regulations, or political instability can disrupt project operations or affect funding availability.

    2. Logistical Challenges: The project may face logistical challenges in reaching remote or underserved areas, including transportation, infrastructure, and supply chain issues.

    Assumptions:

    1. Funding Availability: An assumption is that the project will secure the necessary funding and resources as planned. This includes grants, donations, and in-kind contributions from various sources.

    2. Community Engagement: The project assumes that it will successfully engage and involve the target community, gaining their trust and support.

    3. Government Support: There is an assumption that the government will be supportive of the project's goals and objectives and will not introduce regulatory barriers.

  • Should we know about the theoritical or empirical understanding on the contect for identity risk asand assumption?

  • A risk. A very dangerous concept. If we don't pay attention to risk, the consequence will be high.

  • A risk. A very dangerous concept. If we don't pay attention to risk, the consequence will be high.

  • Samuel of Teach Me Well Ghana

  • It is important to identify the risks and assumptions in a project. It is like trying to avoid an accident that you see coming. Trying to answer ways one can mitigate these risks and assumptions puts one in a better head space to anticipate the worst while hoping for the best - that the project will achieve its intended goal. They may compromise the overall project in various such as, the project taking longer, the actual outcome being different from the desired outcome, waste of resources e.g., time and money etc. Always try and explore all the possible risks to a project for better program impact.

  • Determining risks and assumptions in projects is a very necessary step to take as it helps in making better decisions and making adjustments where necessary. It is essential in determining whether or not, the project proceeds as designed or if changes have to be made in order to achieve the intended goals of the project. Though necessary, it is a bit scary to think of the risks and assumptions because what if all the listed risks and assumptions deters one from continuing for fear of failing? What if the risks and assumptions are so overwhelming that they drown all hope of achieving anything meaningful with the project? I would want to know so I do better, but I also feel like I should not know because I don't want to start all over, I don't want to go back to the drawing board to start with everything from scratch.

  • Risk and Assumption Relationship: It's also important to note that risks can arise from invalid assumptions. For instance, if a project assumption is that a key resource will be available, but that resource becomes unexpectedly unavailable, it can become a risk that threatens the project's success.

    Both risks and assumptions should be documented and regularly reviewed as the project progresses. This allows for proactive risk management and helps prevent unforeseen issues from derailing the project. It's a good practice to revisit these discussions periodically, especially during project planning and at key milestones.

  • Addressing identified risks through contingency plans and regularly revisiting assumptions to ensure they hold true is crucial for the overall success of every project. It is also important for every organization to have adaptability in responding to evolving dynamics and challenges during the life cycle of projects.

  • Les risques et les hypothèses représentent des facteurs externes sur lesquels le projet a peu de contrôle, mais qui peuvent avoir une incidence sur les activités et les résultats du projet. Ces facteurs sont souvent liés à des événements, des contextes et/ou des croyances communautaires. Identifier les risques et les hypothèses aide l'organisation à se préparer à d'éventuelles difficultés pour atteindre l'objectif du programme et à déterminer si une nouvelle conception du programme pourrait être bénéfique.

  • Nairobi Urban Greening Initiative

    The Nairobi Urban Greening Initiative is a comprehensive project aimed at transforming Nairobi into a more sustainable and environmentally friendly urban center. This ambitious undertaking focuses on increasing green spaces, enhancing biodiversity, and improving the overall quality of life for the city's residents. The project includes activities such as planting trees, creating urban parks, and implementing green infrastructure to mitigate the effects of urbanization and climate change. It is a collaborative effort between government bodies, non-governmental organizations, local businesses, and the community, with the primary goal of promoting urban sustainability and resilience.

    Monitoring and Evaluation - Risk and Assumptions
    Assumptions:

    1. Community Engagement:

    Assumption: The local community will actively engage with and support urban greening initiatives, contributing to their success.
    Strategy: Regularly assess community involvement through surveys, workshops, and feedback mechanisms. Adjust community engagement strategies as needed.

    1. Funding:

    Assumption: Continued availability of funding from government bodies or donors to sustain and expand the project.
    Strategy: Maintain close relationships with funding partners, diversify funding sources, and establish contingency plans for potential funding gaps.

    1. Environmental Benefits:

    Assumption: Urban greening initiatives will lead to improved air quality, reduced urban heat, and other environmental benefits.
    Strategy: Implement continuous monitoring of environmental indicators and conduct scientific studies to validate the assumed benefits.

    1. Stakeholder Collaboration:

    Assumption: Various stakeholders, including government agencies, NGOs, and local businesses, will collaborate effectively to implement and manage the project.
    Strategy: Foster strong relationships with stakeholders, establish clear roles and responsibilities, and facilitate regular communication and coordination.

    1. Public Awareness:

    Assumption: There is a sufficient level of public awareness and support for green initiatives in Nairobi.
    Strategy: Conduct public awareness campaigns and assess public sentiment through surveys and social media sentiment analysis.
    Risks:

    1. Political and Regulatory Risks:

    Risk: Changes in government policies or regulations that hinder project progress.
    Mitigation: Stay informed about policy changes, engage with relevant authorities, and advocate for policies that support urban greening.

    1. Environmental Risks:

    Risk: Adverse weather conditions, such as droughts or floods, affecting the success of urban greening efforts.
    Mitigation: Develop resilience plans and adapt planting and maintenance schedules to mitigate climate-related risks.

    1. Community Resistance:

    Risk: Resistance or lack of interest from the local community in participating in green initiatives.
    Mitigation: Conduct community outreach programs, address concerns, and ensure community involvement in decision-making.

    1. Financial Risks:

    Risk: Unreliable or insufficient funding sources jeopardizing project continuity.
    Mitigation: Diversify funding sources, establish financial reserves, and regularly assess financial sustainability.

    1. Implementation Risks:

    Risk: Challenges in coordinating and implementing greening initiatives on a large scale within the city.
    Mitigation: Implement a project management framework, monitor progress, and address implementation issues promptly.

    1. Monitoring and Evaluation Risks:

    Risk: Challenges related to data collection accuracy and monitoring and evaluation efforts.
    Mitigation: Ensure rigorous data quality control, employ independent evaluators, and regularly review and adapt the MEL framework.

  • I have learnt that we must ask our selves what would go wrong on each stage of designing a log frame, however what happens when the case is different when i have a project with over 4 inputs to carry out
    How well can you identify risks and assumptions on the impact stage of the log frame?

  • Do not use the money for investment
    Unwillingness to invest
    Lack of knowledge in investing

  • I have a small doubt about the Impact. I have created a hypothetical project which will work with the Bulk Waste Generators i.e. the residential societies/campuses of the city Gurgaon, India to aware them about the importance of waste segregation and also how In-situ composting can be beneficial in reducing waste generation. For this, following is my log frame-

    IMPACT- Better waste management system
    OUTCOME- More aware people will start segregation of waste and will utilize In-situ composting
    OUTPUT:- 1) Awareness campaign will be conducted

    1. FlashMobs will be done
      INPUTS:- 1) An awareness campaign will be done with the residents of societies on waste segregation and benefits of In-Situ Composting
    2. Flash Mobs on waste segregation and Rules of MCG

    I have some doubts here:-

    Did I set the right Impact for the project ? or should I say that my Impact will be that "people will start segregating waste and will utilize In-Situ Composting"?

    Since module mentions that skill enhancement is not an output, it is an outcome. Similarly, people get aware about the topic is not an output is an outcome? If so, then how will I say that after awareness generation, people have started doing the desired action i.e. waste segregation and use of In-Situ composting.

    I dont see a good flow in my log frame.

  • risks are paramount and need to be assessed because every project has risks

  • What are project assumptions in project management?
    You assume your team will complete milestones according to schedule.
    You assume suppliers will deliver the right items on time.
    You assume that your employees are capable of completing necessary tasks.
    You assume weather or acts of God won't interrupt your progress.

  • The citizens engagement in building the school does not contribute materials.
    The people are not aware with the budget of the school building project.
    The project doesn't get fund.
    No fund allocated

  • i have really enjoyed the topic and it has opened my eyes and i hope to do better in the next modules

  • How to manage risks and reduce the biases assumption ?

  • How can be sure that the risks and assumptions identified will affect the project?

  • I find this module very helpful and informative

  • Risks are the things outside your control that might disrupt your plan
    Assumptions are biases/things that you believe without much evidence
    It's important to plan for risks and assumptions ahead of time to understand unforeseeable events and conditions that might affect the implementation and give you enough time to make decisions at the right time.
    Risks and assumptions are tested within our log frame by looking at our past events and seeing out the activities we had implemented and also by asking the beneficiaries .

  • Identifying risks and assumptions in the logframe is a powerful way to escape your biases. Formative research tries to respond to risks and assumptions before and during the project design phase to foresee the challenges the research may face as it progresses.

  • an assumption can be any idea that is accepted to be true without certainty therefore, until we validate an assumption, they also represent a risk.
    therefore risks and assumptions represent the factors that we cannot control that affect our projects.

  • An assumption is a belief that is held to be true despite the lack of certainty. Assumptions are risky until they are validated. Risks are future occurrences with a high possibility of occurring and a significant impact. Risks can be either beneficial possibilities or negative threats.

  • An assumption is a belief that is held to be true despite the lack of certainty. Assumptions are risky until they are validated. Risks are future occurrences with a high probability of occurring and a significant impact. Risks can be either beneficial possibilities or negative threats.

  • Its always good to reflect on the risks and assumptions in project design so as to be well informed of whatever is going on and what may happen in the near future.

    M
    1 Reply
  • An assumption is a belief that is held to be true despite the lack of certainty. Assumptions are risky until they are validated. Risks are future occurrences with a high possibility of occurring and a significant impact. Risks can be either beneficial possibilities or negative threats.

  • An assumption is a belief that is held to be true despite the lack of certainty. Assumptions are risky until they are validated. Risks are future occurrences with a high possibility of occurring and a significant impact. Risks can be either beneficial possibilities or negative threats.

  • Hi here
    Hello here. Can anyone help me with the peer review?

  • Thank you so much !!! Now tell me about peer review?

Reply to Topic

Looks like your connection to PhilanthropyU was lost, please wait while we try to reconnect.