I would properly start applying the Gantt Chart altogether with the risk management tools from this course.
@lawjcr said in Module 4 Discussion: Implementing Project Management Practices:
In the next few months I will start using project charters, start using stakeholder analysis matrices. All this applications will help me to become a better business Manager.
Best of luck..., in whatever you are aiming to achieve.
@awyndham said in Module 4 Discussion: Implementing Project Management Practices:
This is the module 4 discussion. You may participate in this discussion after beginning module 4.
In this course, you have learned about many different processes, tools, and practices that should help you be a better project manager. However, it is up to you to decide how you will use your new knowledge. In the next few months, what new processes, tools, and practices will you start using on your projects?
Then, find at least one other learner and wish them good luck!
Example post: In the next few months I will (start using project charters, start using stakeholder analysis matrices, etc.)
I have learnt a lot in this program. Going forward, I'm going to use Gannt Chart to schedule my project activities and also introduce Risk Management Log to monitor project progress. I will also pay particular attention to my project charter.
The knowledge I gain on this course of fundamentals of Project Management are very helpful for me more importantly how to manage a team as well as related issues which arise during project implementation, i will use these skills like WBS ,GANTT chart , RACI matrix and knowledge to improve my project.
I have learnt so much more than I learnt in my project management class at school which even lasted longer than the duration of this course. I am going to make sure I put the knowledge to good use. Thank you very much and good luck to my fellow course mates.
@awyndham said in Module 4 Discussion: Implementing Project Management Practices:
This is the module 4 discussion. You may participate in this discussion after beginning module 4.
In this course, you have learned about many different processes, tools, and practices that should help you be a better project manager. However, it is up to you to decide how you will use your new knowledge. In the next few months, what new processes, tools, and practices will you start using on your projects?
Then, find at least one other learner and wish them good luck!
Example post: In the next few months I will (start using project charters, start using stakeholder analysis matrices, etc.)
Risk and Issue management
@Aba said in Module 4 Discussion: Implementing Project Management Practices:
I have learnt so much more than I learnt in my project management class at school which even lasted longer than the duration of this course. I am going to make sure I put the knowledge to good use. Thank you very much and good luck to my fellow course mates.
You are right my fellow colleague in the project
@Richa_Singh said in Module 4 Discussion: Implementing Project Management Practices:
The knowledge I gain on this course of fundamentals of Project Management are very helpful for me more importantly how to manage a team as well as related issues which arise during project implementation, i will use these skills like WBS ,GANTT chart , RACI matrix and knowledge to improve my project.
I agree with you. It has simplified matters that would have otherwise been complicated
@Myo said in Module 4 Discussion: Implementing Project Management Practices:
@lawjcr said in Module 4 Discussion: Implementing Project Management Practices:
In the next few months I will start using project charters, start using stakeholder analysis matrices. All this applications will help me to become a better business Manager.
Best of luck..., in whatever you are aiming to achieve.
Goodluck pal
@Melchizedek said in Module 4 Discussion: Implementing Project Management Practices:
@Richa_Singh said in Module 4 Discussion: Implementing Project Management Practices:
The knowledge I gain on this course of fundamentals of Project Management are very helpful for me more importantly how to manage a team as well as related issues which arise during project implementation, i will use these skills like WBS ,GANTT chart , RACI matrix and knowledge to improve my project.
Best of Luck in your endeavour
@Melchizedek said in Module 4 Discussion: Implementing Project Management Practices:
@Aba said in Module 4 Discussion: Implementing Project Management Practices:
I have learnt so much more than I learnt in my project management class at school which even lasted longer than the duration of this course. I am going to make sure I put the knowledge to good use. Thank you very much and good luck to my fellow course mates.
You are right my fellow colleague in the project. Best of luck
@Melchizedek said in Module 4 Discussion: Implementing Project Management Practices:
@Richa_Singh said in Module 4 Discussion: Implementing Project Management Practices:
The knowledge I gain on this course of fundamentals of Project Management are very helpful for me more importantly how to manage a team as well as related issues which arise during project implementation, i will use these skills like WBS ,GANTT chart , RACI matrix and knowledge to improve my project.
I agree with you. It has simplified matters that would have otherwise been complicated. Best of luck
@Manishimwe said in Module 4 Discussion: Implementing Project Management Practices:
@awyndham said in Module 4 Discussion: Implementing Project Management Practices:
This is the module 4 discussion. You may participate in this discussion after beginning module 4.
In this course, you have learned about many different processes, tools, and practices that should help you be a better project manager. However, it is up to you to decide how you will use your new knowledge. In the next few months, what new processes, tools, and practices will you start using on your projects?
Then, find at least one other learner and wish them good luck!
Example post: In the next few months I will (start using project charters, start using stakeholder analysis matrices, etc.)
now on i will be using the Gantt chart to schedule my project activities and the Raci matrix to distribute roles and responsibilities, i have noticed that these two tools aligned together will help me monitor and evaluate my project
i wish every one here good luck and success in your projects
Rodgers
I am very impressed by the course.. Hope I will utilize all skills and knowlegde I acquired soon in our organization..
cheers to everyone
@awyndham said in Module 4 Discussion: Implementing Project Management Practices:
In the next few months I will (start using all of what i learned. Am so excited)
In the next few months, I will start learning how to apply managing people on my project that I am working on now. Because, people management is a serious in project management.
In a few months, i am going to do tasks like End of project transitions, Identifying Risk, identifying issues and managing issues. Thank you PU and all the peer friends.
The project charter has been overlooked almost always. I will from now put this together and make this my reference document from which to update and adjust happenings as well as track progress of work.
I will also put to use the stakeholder analysis and the Gantt Chart.
I have learnt a lot, one of which is how to manage resources and stay to plan during project implementation. I have also learnt well how to manage risk that are associated to project and how well to also manage each of this risks identified and am willing to make use of this tools learnt on the my project .
Honestly speaking, I have learnt a lot about project management. Henceforth, I will be using Gantt Chart, Stakeholders' analysis, Network Analysis, Activity based budget using combination of "Top down, Bottom up and Parametric techniques", Risk Assessment Matrix, and "RACI and DACI Matrix" .
I want to say a BIG THANK YOU tothe initiator of this program, his team and associates, all facilitators and instructors.
Thank you for making a world a better place through education/e-learning.
In the next few months I will start using project charters, start using stakeholder analysis matrices and also gantts chart
@Jcmoore said in Module 4 Discussion: Implementing Project Management Practices:
Honestly speaking, I have learnt a lot about project management. Henceforth, I will be using Gantt Chart, Stakeholders' analysis, Network Analysis, Activity based budget using combination of "Top down, Bottom up and Parametric techniques", Risk Assessment Matrix, and "RACI and DACI Matrix" .
I want to say a BIG THANK YOU tothe initiator of this program, his team and associates, all facilitators and instructors.
Thank you for making a world a better place through education/e-learning.
good luck to you
In the next few months I will start using RACI matrix also stakeholder analysis matrices. All this applications will help me to become a better Manager and to inculcate my theoretical knowledge into practical one.
@awyndham said in Module 4 Discussion: Implementing Project Management Practices:
This is the module 4 discussion. You may participate in this discussion after beginning module 4.
In this course, you have learned about many different processes, tools, and practices that should help you be a better project manager. However, it is up to you to decide how you will use your new knowledge. In the next few months, what new processes, tools, and practices will you start using on your projects?
Then, find at least one other learner and wish them good luck!
Example post: In the next few months I will (start using project charters, start using stakeholder analysis matrices, etc.)
There was just so much i learned from this course that i found very useful. I am motivated to say that i will want to use everything i learnt. But definitely some of the ones that i will want to use include the Work Breakdown Structure, Gantt Charts, Stakeholder Analysis Risk Assessment Matrix and RACI Matrix.
Though i never had any formal Project Management training and learnt basic project management from working in the field, after doing this course, it made me wonder what was i really doing before.
@luvmanuel said in Module 4 Discussion: Implementing Project Management Practices:
@Jcmoore said in Module 4 Discussion: Implementing Project Management Practices:
Honestly speaking, I have learnt a lot about project management. Henceforth, I will be using Gantt Chart, Stakeholders' analysis, Network Analysis, Activity based budget using combination of "Top down, Bottom up and Parametric techniques", Risk Assessment Matrix, and "RACI and DACI Matrix" .
I want to say a BIG THANK YOU tothe initiator of this program, his team and associates, all facilitators and instructors.
Thank you for making a world a better place through education/e-learning.good luck to you
@luvmanuel, i definitely endorse your comment
@Jcmoore said in Module 4 Discussion: Implementing Project Management Practices:
Honestly speaking, I have learnt a lot about project management. Henceforth, I will be using Gantt Chart, Stakeholders' analysis, Network Analysis, Activity based budget using combination of "Top down, Bottom up and Parametric techniques", Risk Assessment Matrix, and "RACI and DACI Matrix" .
I want to say a BIG THANK YOU tothe initiator of this program, his team and associates, all facilitators and instructors.
Thank you for making a world a better place through education/e-learning.
Good luck to you @Jcmoore ...appreciated your feedback
@Letema said in Module 4 Discussion: Implementing Project Management Practices:
@Manishimwe said in Module 4 Discussion: Implementing Project Management Practices:
@awyndham said in Module 4 Discussion: Implementing Project Management Practices:
This is the module 4 discussion. You may participate in this discussion after beginning module 4.
In this course, you have learned about many different processes, tools, and practices that should help you be a better project manager. However, it is up to you to decide how you will use your new knowledge. In the next few months, what new processes, tools, and practices will you start using on your projects?
Then, find at least one other learner and wish them good luck!
Example post: In the next few months I will (start using project charters, start using stakeholder analysis matrices, etc.)
now on i will be using the Gantt chart to schedule my project activities and the Raci matrix to distribute roles and responsibilities, i have noticed that these two tools aligned together will help me monitor and evaluate my project
i wish every one here good luck and success in your projects
RodgersI am very impressed by the course.. Hope I will utilize all skills and knowlegde I acquired soon in our organization..
cheers to everyone
@Manishimwe wishing you all the best in all your project management endeavours
@Aba said in Module 4 Discussion: Implementing Project Management Practices:
I have learnt so much more than I learnt in my project management class at school which even lasted longer than the duration of this course. I am going to make sure I put the knowledge to good use. Thank you very much and good luck to my fellow course mates.
@Aba, all the best in your continued efforts...and i share your sentiments as well
@awyndham said in Module 4 Discussion: Implementing Project Management Practices:
This is the module 4 discussion. You may participate in this discussion after beginning module 4.
In this course, you have learned about many different processes, tools, and practices that should help you be a better project manager. However, it is up to you to decide how you will use your new knowledge. In the next few months, what new processes, tools, and practices will you start using on your projects?
Then, find at least one other learner and wish them good luck!
Example post: In the next few months I will (start using project charters, start using stakeholder analysis matrices, etc.)
I have learnt alot in this project management course. In the next few months I will be able to apply this knowledge and utilising the Gantt charts, stakeholders analysis matrices, and RACI matrix in my work. I will be able to manage people, issues and other changes that will come my way, as a manager.
@emmaowilli said in Module 4 Discussion: Implementing Project Management Practices:
I have Learnt Much on Project Management most especially how to manage a team as well as issues that arise during project implementation, i will use these skills and knowledge learnt to improve my project and team in the near future
All the best as you apply the knowledge gained from the course. Surely, this course is helped across all sectors of management. Good luck
I've learned a lot in this course. In the next month i will start using Gantt Chart, RACI Matrix to define roles and responsibilities, the stakeholders analysis framework and above all the Risk assessment matrix
@awyndham said in Module 4 Discussion: Implementing Project Management Practices:
ou have learned about many different processes, tools, and practices that should help you be a better project manager. However, it is up to you to decide how you will use your new knowledge. In the next few months, what new processes, tools, and practices will you start using on your projects
i have learned more different processes , tools and practices that help me to be a better project manager. how ever it is vey helful hints of project manager
In the next few months ill be using what i have learned from this courses to be a better and proactive project manager. I can share with others the new learning and new technique.
In this next few month I will beging to apply how to analyse stakeholder and think about responsibility of project Manager in my project.
It was a tremendous model in which we learned step by step project management, which will help in us in the future.
In the next few months, I will start using the stakeholder analysis matrices, start using the RACI matrix and also the Gantt chart
In the next few months I will start applying all the skills I have achieved from this course in my Disability Awareness project In Rwanda. The charter, Stakeholder Management matrices, and other useful tools will help me succeed in my project implementation.
I will have to use the RACI Matrix Tool, Stakeholder Anaysis Tool, and the Risk Assessment Tool
Throughout my career I most definitely plan to use an issue log. I think this is a great way for staff to be open about issues they are experiencing throughout the project and make sure they are being resolved. It also helps at the end of the project with the learning process by identifying different risks they were not realized before the project began.
@VictorPope said in Module 4 Discussion: Implementing Project Management Practices:
In the next few months, I will start using the stakeholder analysis matrices, start using the RACI matrix and also the Gantt chart
Good luck using these in the future! I hope they are very helpful for the different projects you work on.
I look forward to putting everything I've learnt to practical use in the coming months. Excellent course... Highly recommended.
In the next few weeks I will start implementing the project management practices that i have learned from the course. I am now better informed than I was before. I will also encourage my team to enroll in this course and this will improve our understanding, coordination and cooperation on the project.
This training is marvellous! As a project manager at SOME, I never used any of the tools nor skills that I have being exposed to in the course of this training! I know now that I have acquired very important skills to make deliver more quality and professional job at SOME. Kudos to Philanthropy University!
I have gained alot of knowledge on project management, in the next few month I will start using project charters, stakeholder analysis matrices, soft and hard skill and above all as a project manager I will deliver my project within stipulated time, budget and scope.
I learned a lot through this course. Especially it allowed me to discover and improve my competence. Delegation of stains through RACI will allow me to face future projects with less stress
In the next few months i will start use work breakdown structure,risk register,Gantt chart,RACI
It has been an experience indeed. All modules have been so relevant. I have learnt so much and this course has also highlighted how much I need to learn! What's more the assignments and tools like the Gantt Chart, Stakeholder Analysis, Work Break Down Structure and the RACI Matrix has given me a so much clearer picture of my intended project. Thank you Philanthropy University!!!
@Loveth said in Module 4 Discussion: Implementing Project Management Practices:
I have gained alot of knowledge on project management, in the next few month I will start using project charters, stakeholder analysis matrices, soft and hard skill and above all as a project manager I will deliver my project within stipulated time, budget and scope.
Kudos to you and loads of success!!!
In the next few months I will start using project charters, Gantt chart and RACI matrix in a lot of things that I'd do
This course was packed with very many insightful tools
I will try to analyse the interests of my stakeholders more and manage them better. The projects I work on have a multitude of stakeholders that need to be managed and I have always done that on an adhoc basis which is has been challenging.
The course has been of great help to me. I will be able to use the skills learnt to manage projects assigned to me , more so the RACI matrix, Gant chart , soft skills of managing people and how to manage the three constraints( Scope, budget and schedule)
It was really a good pleasure for me to take this course. Very usefull to me and i will try to out it into practice
This program has taught me a lot therefore going forward, a number of tools that I learnt here like the Stakeholder analysis matrix to better engage my project stakeholders and The RACI to enhance internal controls
I think that this last module is very important because it covers all others module in this course.
It true that I have learned a lot from this course, but I need furthermore.
My question is about the issue.
Is there a percentage for an issue before to contact the donor in a project. Because what I understood is that the issue can be solved by everybody all the personal in the project. But when even the project manager and the governance can not solve it, they will contact the donor.
@awyndham said in Module 4 Discussion: Implementing Project Management Practices:
In the next few months, what new processes, tools, and practices will you start using on your projects?
I will try to use the DACI more formally. And I like the tool to calculate risk.
@GokulKumar said in Module 4 Discussion: Implementing Project Management Practices:
In the next few months I will start using project charters, Gantt chart and RACI matrix in a lot of things that I'd do
Good luck using these new tools!
@awyndham said in Module 4 Discussion: Implementing Project Management Practices:
This is the module 4 discussion. You may participate in this discussion after beginning module 4.
In this course, you have learned about many different processes, tools, and practices that should help you be a better project manager. However, it is up to you to decide how you will use your new knowledge. In the next few months, what new processes, tools, and practices will you start using on your projects?
Then, find at least one other learner and wish them good luck!
Example post: In the next few months I will (start using project charters, start using stakeholder analysis matrices, etc.)
Having learnt much, I wish to in the next few months to put to work all that I have learnt into projects.
@jlg said in Module 4 Discussion: Implementing Project Management Practices:
@awyndham said in Module 4 Discussion: Implementing Project Management Practices:
In the next few months, what new processes, tools, and practices will you start using on your projects?
I will try to use the DACI more formally. And I like the tool to calculate risk.
Good luck
I will start using Gantt chart ,managing issues,-using issues log and also assessing risks
I learnt redefined ways of going about a project.... I will be applying these methods..
I have quiet a lot from this course.I will certainly use Gantt Chart and RACI Matrix in my next family project.
I am really thankful to this online course. The tools, the Modules have been clearly explained. I will start using the RACI matrix, I will use the Issue log and the Risk management system as well.
Just one thing that I think the online course should look at is that they put the last 3 Assignments (Module 2-4) due to the same date.
I experienced some problem in my country, unrest and I could not have access to internet, so I missed to submit on time my Assignments because of this.
Thank you
@Joeakor2020 said in Module 4 Discussion: Implementing Project Management Practices:
I will start using Gantt chart ,managing issues,-using issues log and also assessing risks
Great. Good luck!
This course has been very helpful in articulating some of very important aspects/tools yet often ignored in project management. The RACI tool for instance is quite exciting at managing personnel. Since i have never applied it in my previous projects (or perhaps i did that informally), i will be adopting it in the upcoming projects given how it helps in enhancing clarity of roles.
Thanks to the team that availed this course. I will be glad to continue using this platform.
More than enough was learned in this course. In the next few months I will start to use the project charter, I see it as a plan and I will frequent the use of Gantt chart as well as other tools learned in this course. The tools will help me achieve greatly my objectives of enrolling for the course.
@eric_njue said in Module 4 Discussion: Implementing Project Management Practices:
This course has been very helpful in articulating some of very important aspects/tools yet often ignored in project management. The RACI tool for instance is quite exciting at managing personnel. Since i have never applied it in my previous projects (or perhaps i did that informally), i will be adopting it in the upcoming projects given how it helps in enhancing clarity of roles.
Thanks to the team that availed this course. I will be glad to continue using this platform.
I wish you all the best as you apply what was learned. I am glad to have you as a course mate.
In fact, i have learned project management in order to implement in a professional way which is useful to me to carryout the project as well as to teach others who are in the field. I really I have fresh knowledge in the field.
its's been a great way to go back at the things i might have missed while accomplishing my projects
@awyndham said in Module 4 Discussion: Implementing Project Management Practices:
This is the module 4 discussion. You may participate in this discussion after beginning module 4.
In this course, you have learned about many different processes, tools, and practices that should help you be a better project manager. However, it is up to you to decide how you will use your new knowledge. In the next few months, what new processes, tools, and practices will you start using on your projects?
Then, find at least one other learner and wish them good luck!
Example post: In the next few months I will (start using project charters, start using stakeholder analysis matrices, etc.)
The Gantt Chart makes scheduling so easy to document and to interpret. I am going to apply it right away in designing my next project.
help!!!!
i cant submit my assignment.
In the next few months I will start using project charters, start using stakeholder analysis matrices and responsibility assignment methods
@YusufBulama said in Module 4 Discussion: Implementing Project Management Practices:
help!!!!
i cant submit my assignment.
me too. we are late
In the few months to come, I will be the RACI matrix together with the knowledge gained from other modules in my organization and especially on projects
Thank you
@awyndham said in Module 4 Discussion: Implementing Project Management Practices:
This is the module 4 discussion. You may participate in this discussion after beginning module 4.
In this course, you have learned about many different processes, tools, and practices that should help you be a better project manager. However, it is up to you to decide how you will use your new knowledge. In the next few months, what new processes, tools, and practices will you start using on your projects?
Then, find at least one other learner and wish them good luck!
Example post: In the next few months I will (start using project charters, start using stakeholder analysis matrices, etc.)
The Gantt Chart makes scheduling so easy to document and to interpret. I am going to apply it right away in designing my next project.
I'm glad to have learnt a great deal from this course. I will do well to start making effective use of Gantt chart and Risk & stakeholder management models for better outcomes in projects I'll be working on. Goodluck to everyone else.
@EmmaEkuase said in Module 4 Discussion: Implementing Project Management Practices:
@awyndham said in Module 4 Discussion: Implementing Project Management Practices:
This is the module 4 discussion. You may participate in this discussion after beginning module 4.
In this course, you have learned about many different processes, tools, and practices that should help you be a better project manager. However, it is up to you to decide how you will use your new knowledge. In the next few months, what new processes, tools, and practices will you start using on your projects?
Then, find at least one other learner and wish them good luck!
Example post: In the next few months I will (start using project charters, start using stakeholder analysis matrices, etc.)
The Gantt Chart makes scheduling so easy to document and to interpret. I am going to apply it right away in designing my next project.
Goodluck!
Module 4 was quite loaded.
Fundamental for me was the differentiation of Risks and Issue, Scope creep, and the RACI Matrix tool.