Please update your browser
We have detected that you are using an outdated browser that will prevent you from using
certain features. An update is required to improve your browsing experience.
We have detected that you are using an outdated browser that will prevent you from using
certain features. An update is required to improve your browsing experience.
Contracting Officer’s Technical Representative (C.O.T.R.) for multiple contracts valued at over $10 million, total
Managed staff of 106 individuals, including licensed professionals, clerical, bookkeeping, and support staff, as well as day-today operations of 3 major and 5 smaller contractors for Operations, on-call services, preventative maintenance, and repair and
installation of HVAC and related equipment and services. Managed HVAC needs for a portfolio of over 350 buildings, including
Public Schools, Police and Fire Stations, Parks and Recreation sites, Family, Battered Women, and Homeless Shelters, and
Municipal buildings Conducted surveys and assessments of entire building HVAC systems and occupied and mechanical
spaces Successfully integrated Operations, Contract Services, and Preventative Maintenance divisions within the Department,
and assumed overall management responsibilities for all 3 divisions
Primary Human Resources contact for Operations, Contract Services, and Preventative Maintenance divisions. Worked closely
with agency H.R. Director, as well as Union Representatives on Disciplinary, hiring, firing, and promotion issues. Authorized
changes in work assignment locations, shifts, etc., for all personnel. Member of Contracts Assessment and Selection
Committee for Major and Minor Contracts. Collect and analyzes statistical information on facility structural, mechanical, and
electrical components such as space construction and usage, electrical loads and needs, and adequacy of mechanical
equipment and humidification. This information is collected for the SI-wide computerized facility management information
system (MIS) and published on the SI Intranet. Enforce federal mandates of resource conservation, sustainability and
management of natural resources. Investigate the application of equipment and construction methods which will reduce energy
and water consumption, e.g. insulation of buildings; modification of building lighting systems to provide more illumination with
less power, application of economizers or heat exchange equipment in utilities plants and in production equipment; off-peak
operation or load shedding of equipment to reduce electrical demand; and sizing of mechanical and electrical equipment for
minimum energy consumption.
Prepare documents for the development of construction package Projects include critical documentation, of which the success
of the project is dependent, and requires the review of unusual or controversial data where no directly applicable technical
information is available. Projects involve determining total project considerations such as alternatives, cost economic analysis,
feasibility, need, job requirements, budget
It seems like there is a problem with the module
Hi, I think that everyone can now very well do easily proposal writing.